| A.B. Garden |
 |
| Project Specifications: Only for Double Houses ( Ground Floor & First Floor) |
| Foundation: |
| RCC Column foundation in 1: 2: 3 mix with necessary steel reinforcement. |
| Basement : |
| Basement height will be 3’6” from the present ground level. RCC plinth beam (1’0” * 0’9”) in 1:2:4 mix with steel reinforcement. Above plinth beam Brick work in cm 1:7. All two (Plinth beam & Brick work) Comprises 3’6” height. Basement is filled with good filling sand upto floor level. |
| Super Structure : |
Brick work in cm 1”7 using best quality of chamber bricks. Ceiling at 10’0” Which includes slab thickness. Parapet wall 2’9” height. |
| RCC Works |
| All RCC works in 1:2:4 mix with necessary steel reinforcement. Lofts and Sunshades are as required. |
| Joineries: |
| Main Door |
|
Teak wood door |
| Rear Door |
|
Kongu with flush Poovarasu shutter door |
| Bed Doors |
|
Kongu with flush Poovarasu shutter door |
| Toiled Doors |
|
PVC frame with PVC shutter |
| Front & Rear Grill Gates |
|
All doors will be fitted with Ordinary Aluminum Aldrop, tower bolt, handle and Rubber bush.
All windows are using country wood with glazed shutters fitted with Ordianary.
Aluminium Tower bolt, handle and hook & eye.
All doors and Windows sizes are as per the drawing enclosed.
All doors and Windows are painted with enamel paint two coats one coat of Primer. Main door will be polished. |
| Cooking Top, Cupboards & Ward Robes : |
| Build with Brick work and Cuddapah slaps. |
| Flooring & Finishing |
Flooring using PCC 1:5:10 using 40 mm stone jelly. Floor finishing using Ceramic tiles using cement mortar (Plain Colour of 16” * 16” size). Rate, Rs. 24/sqft. |
| Terrace |
| Terrace will be finished with lime, cement and combination mortar of mix 1:1:4 and pattern tiles. |
| Painting |
| Ceiling in side walls and outside are painted with two coats of Snowcem. |
| Plumbing |
| Plumbing works are using PVC pipes with GI fittings. Kitchen will be provided with one tap. Toilet will be provided with two taps (One for Closet and Other one with Shower). |
| Electrification |
| All Electrical works are concealed with KUNDAN cables and Anchor Piano switches. Hall will be provided with one fan and two light points. Kitchen will be provided with one exhaust fan point , one light point and provision for Mixie/Grinder. Bedrooms are provided with one light point, one fan point, one light lamp and one 5A socket. Toilets and passage are provided with one light point each. At outside provided with one light point in each side. All comprises a total number of 34 points, which includes 22 light/fan points and 12 5A points. |
| Other Works |
- Bore well and Motor.
- Plumbing line from bore to overhead tank.
- Under Ground water sump.
- Septic tank, dispersion trench and water tank.
- Outside platforms, Compound wall & Main gate.
|
| Following other works include in this Specification |
- E.B., Main Board Work
- Registration
|